The Challenge

  • Remote sites. Many projects sit beyond the reach of the grid or at the end of a constrained line.
  • Fuel cost and logistics. Diesel must be hauled long distances, and generators run around the clock to hold reserve.
  • Timelines. Transmission and interconnection upgrades can take longer than the project schedule allows.
  • Emissions commitments. Operators face growing expectations to reduce fuel use and site emissions.

How GEL Helps

  • Hybrid operation with existing generators to reduce run hours and fuel consumption
  • Added capacity for grid-connected sites during expansion or ahead of an upgrade
  • Peak demand management for larger grid-connected operations
  • Silent, emission-free power for camps and work areas
  • Units that relocate as the mine plan changes and scale as the operation grows

Recommended Platform

NOMAD Voyager mobile battery energy storage unit on a semi trailer.

Voyager Falcon

500 kW, 2.0 MWh. For sustained hybrid operation.

NOMAD Voyager Eagle mobile battery energy storage unit, rear view.

Voyager Eagle

999 kW, 2.0 MWh. For high power loads.

Semi truck transporting a NOMAD Voyager mobile battery energy storage unit.

Discuss Your Power Requirements

Tell us about your site, your load, and your timeline. GEL will review the data and come back with a sized system and a commercial structure that fits.

Talk to Our Team